Wind + Solar + BESS | Broadview | 480 MW/750 MW/800 MWh | MT | Broad Reach/Engie | Project Manager/PD (WSP) |
Solar PV + BESS | AZ2 | 33 MW/20 MWh | AZ | Sterling & Wilson/Origis | Project Director/EOR (WSP) |
ZEB + MG | EMTOC | 70 chargers + 5 MW | MD | Mortenson/Alphastruxure | Project Director/EOR (WSP) |
Solar PV + BESS | Edward Sanborn | 1 GW/2 GWh | CA | Mortenson/TerraGen | Project Director/IE (WSP) |
Wind | Rock River | 50 MW | WY | PacifiCorp | Project Director/EOR (WSP) |
Solar PV | Riverstart | 200 MW | IN | EDPR | Project Director/EOR (WSP) |
BESS | Chisholm | 100 MW/100 MWh | TX | Mortenson/Eolian | Project Manager/PD & SCADA EOR (WSP) |
Solar PV | Morris Ridge | 162 MW | NY | EDF | Project Director/PD (WSP) |
Wind | Strauss Wind | 95 MW | CA | BayWa | Project Manager/Civil EOR (WSP) |
Wind | Gonzaga Wind | 100 MW | CA | Scout | Wind Turbine Expert/OE (WSP) |
Solar PV | Finley Solar | 133 MWac | NSW AUS | Signal/Wirsol | Project Manager/EOR (WSP) |
BESS | Texas Waves | 20 MW/10 MWh | TX | Primoris/RWE | Project Manager/EOR (WSP) |
BESS | Clinton | 10 MW/5 MWh | OH | Exelon | SCADA Lead/EOR & Master Controller (RES) |
Solar PV | Lamesa | 102 MW | TX | Southern Power | SCADA Lead/EOR & Factory Audits (RES) |
Transmission | MATL | 214 Mi/230 kW | MT US & AB CAN | Enbridge | Crane Lift Engineer (RES) |
Wind | Broadview | 322 MW | NM | Pattern Energy | Turbine Installation & Crane Lift Engineer (RES) |
Wind | Buffalo Dunes | 250 MW | KS | EGP | Turbine Engineer (RES) |
Wind | Cedar Point | 252 MW | CO | Enbridge | Turbine Engineer (RES) |
Wind | Lower Snake River | 343 MW | WA | Puget Sound Energy | Turbine Engineer (RES) |
Wind | Eye of the Wind | 1.5 MW | BC CAN | Grouse Mountain | Turbine Engineer & Project Manager (Leitner) |
Cable Ropeway | Revelation Lift | 4 place fixed grip ski lift | CO | Telluride | Sales Engineer (Leitner) |
Cable Ropeway | Christie Lift | 6 place detachable ski lift | CO | Steamboat Springs | Sales Engineer & Installation Engineer (Leitner) |
Cable Ropeway | Montezuma Lift | 4 place fixed grip ski lift | CO | Arapahoe Basin | Sales Engineer & Installation Engineer (Leitner) |
Manufacturing Facility | Ski Lift Facility | New manufacturing facility | CO | Leitner Poma of America | Sustainability and Energy Analysis (Leitner) |
Combustion System | Mach Test Facility | H2 Piping and Duct Burners | OH | NASA | Senior Engineer (Coen) |
Combustion System | Wagner 4 | Steam Injection System | MD | Constellation | Project Engineer & Project Manager (Coen) |
Combustion System | H2 Boiler | Advanced H2 Combustion System | TX | Linde Gas | Project Engineer & Project Manager (Coen) |
Combustion System | NG Boiler | Ultra-Low NOx Combustion System | TX | TPC | Project Engineer & Project Manager (Coen) |
Combustion System | Brewery Boilers | Vibration & Acoustic Analysis | WI | Miller Brewing | Project Engineer (Coen) |